Bulk Fuel Storage And Supply

GENERAL CONSTRUCTION

The project includes the construction of three 25,000 Barrel TS-1 Storage Tank with Pump Facility; Cut and cover tank with concrete pump house built on top of each tank and associated materials/equipment to connect into the under-construction South Tank Farm Facility.

Project Scope Includes

  • Three TS-1 Storage Tank
  • Filter Building with Controls, Fill & Issue Lines
  • Three new fill stands
  • Underground POL pipeline
  • Site improvement and demolition