Drainage System, Phase 3

GENERAL CONSTRUCTION

The project includes various base-wide upgrades to the Bagram drainage infrastructure.

Project Scope Includes

  • Closed drainage system with piping
  • Open drainage system with piping
  • Micro-tunneling
  • Manholes & catchbasins