This project includes an expansion to Water Treatment Plant #3 on the eastside of Bagram.

Project Scope Includes

  • Deep water well drilling
  • Water distribution piping including all indicated valves, tees, bends, hydrants, service connections
  • Expansion of the Bagram Wastewater Treatment Plant
  • Gravity sanitary sewer collection piping
  • Sanitary force main piping including manholes and service connections
  • Sewer piping with three sanitary sewer lift stations
  • 3 utility bridges
  • WWTP expansion has concrete equalization and aeration tanks, Retaining Wall, WWTP Control Building, Headworks unit