Saray Hydroelectric Power Plant

GENERAL CONSTRUCTION

Saray HEPP Generation Facility in Rize province will be commissioned June 2014.

Project Scope Includes the Construction of

  • Water Inlet Structure
  • Turbines
  • Water Intakes And Settling Basin
  • Water Transmission Line
  • Water Tunnel Penstock
  • Surge Tanks
  • Power Plant
  • Drill and Blast Horseshoe Tunnel
  • Earthworks